Walkout Secondary Suite in Hotchkiss, Calgary
A completed Grains Construction project in Hotchkiss, Calgary. Consultation, 2D structure design, permits, construction, inspections and handover, walked through room by room below.
Walkthrough
Inside this project

The kitchen
A full kitchen with cabinetry, counters, sink and appliance connections on their own dedicated circuits. Plumbing was brought in and tied to the existing stack, and the range and dishwasher were wired by licensed trades and inspected before the cabinets went in.
The layout keeps the working triangle tight so the space functions properly rather than just looking complete in a photograph. Backsplash, counter and cabinet hardware were specified together, and the appliance package was planned into the elevation from the start rather than squeezed in at the end.

Daylight and a door at grade
That changes the layout completely. The living space goes against the glass, and the rooms that need less daylight move back into the plan. It also removes the objection that keeps some tenants away from below grade units entirely.
On a walkout lot the lower level stops behaving like a basement. The rear wall sits at grade, so the space gets full height glazing and a door straight out to the yard instead of a stairwell and a light well.

The bathroom
The bathroom is where shortcuts show up first, usually two winters later. Behind the tile there is a proper waterproofing system on the wet walls, the correct substrate and a floor built to fall to the drain. Mechanical extraction is ducted to the outside rather than into the joist space.
Plumbing rough in was inspected before anything was closed up, and the finishes went on afterwards: tiled shower, glass enclosure, vanity, mirror and fixtures. Getting the sequence right is what keeps a basement bathroom dry for its whole life.

Every bedroom, every EGRESS WINDOW
This is the single most common reason an existing basement fails to legalise. Rooms get called bedrooms without a compliant opening, and the fix means saw cutting the foundation. Building the opening correctly the first time is far cheaper than correcting it afterwards.
Every bedroom below grade needs a compliant EGRESS WINDOW, sized so an adult can get out and a firefighter can get in, with the window well dimensioned to match. It is not optional and it is not a detail you can add later without cutting concrete, so it is designed in from the first drawing.

The stairs
Stair geometry is governed by code: consistent rise and run, minimum headroom, and a handrail at the required height. Existing basement stairs frequently fail one of those, and correcting them is part of bringing the level up to standard.
Finishing the stairs properly also does a lot of quiet work on how the whole level feels. It reads as part of the home rather than the way down to a basement.

The bathroom
The bathroom is where shortcuts show up first, usually two winters later. Behind the tile there is a proper waterproofing system on the wet walls, the correct substrate and a floor built to fall to the drain. Mechanical extraction is ducted to the outside rather than into the joist space.
More Photos
The rest of the build



Scope Of Work
What this build involved
Grade Level Entrance
The walkout entrance built out and finished as a proper independent door for the suite, with landing and exterior detailing.
Full Height Glazing
Door and window openings along the walkout elevation, framed, installed and finished to bring real daylight into the unit.
Egress Windows
Egress window to code in every bedroom, sized and installed with the well detailed correctly.
Full Kitchen & Bathroom
Complete independent kitchen and bathroom for the suite, with dedicated services and appliance connections.
Fire Separation
Rated separation between suite and main dwelling, with interconnected smoke and carbon monoxide alarms throughout.
Permits & Inspections
Development and building permits managed end to end, with every required inspection booked, attended and closed.
Is a walkout suite worth more than a standard basement suite?
It usually rents more easily. Grade level entry and full size windows remove the two things tenants most often object to in a basement unit, which tends to show up as shorter vacancy rather than a dramatically different rent.
Does a walkout still need a separate entrance built?
The walkout gives you the opening, but the entrance still has to be built out and finished as a code compliant independent entry for the suite, including the door, landing and exterior work.
Do bedrooms in a walkout suite still need egress windows?
Yes. Every bedroom in a secondary suite needs a compliant egress window regardless of whether the lot is a walkout. The larger glazing on the walkout elevation does not automatically satisfy the requirement in rooms that face the other way.
Can a walkout suite be used as a short term rental?
That depends on current City of Calgary business licensing and any rules attached to your property. The build itself is the same legal suite either way. We can point you at what to confirm before you commit to a plan.
How long does a walkout suite take to build?
Expect a similar window to any legal suite, commonly around 8 to 14 weeks on site depending on scope, with permit review ahead of that. Exterior work on the walkout elevation can add time in deep winter.
Want a basement like this one? It starts with a free visit.
Quick Quote
Tell us about your project.
We'll do the rest.
Answer a few quick questions and we'll prepare your free consultation, complete with free 2D structure design.
- Takes under a minute
- No obligation, no pressure
- Permits and inspections included




